Big Rivers Solar Education Center

  • About Us
    • Big Rivers
    • Jackson Purchase Energy Corporation
    • Kenergy Corp
    • Meade County Rural Electric Cooperative Corporation
  • Solar Arrays
    • Brandenburg
    • Hardinsburg
    • Owensboro
    • Henderson
    • Livingston County Middle School
    • Mike Miller Park
    • McCracken County High School
  • Learn More
    • How Solar Works
    • System Components
    • Our Solar Generation
    • What It Cost

JPEC – Mike Miller Park

Instantaneous Power (kW)

7.68

Temperature
(F)

62.8°

Maximum Power (kW)

8.23

Irradiance (Solar Strength)

391 W/m²

March 31st, 2023
  • Hourly
  • Daily
  • Monthly
  • Yearly
View Site Specifications

Refresh the Page — (page auto-refreshes every 30 minutes)

previous arrow
next arrow
previous arrownext arrow
Shadow
Slider
  • System Size: 10.08 Kilowatt DC/8.25 Kilowatt AC
  • Total Number of Solar Modules: 32
  • System Phasing & Voltage: Single Phase 120/240 V
  • Maximum Possible Total System Current: 42.625 Amps
  • System Footprint: 27’ x 54’ or 1,215 sq. ft.
  • Number of Arrays: 2
  • Array(s) Azimuth: 175° Off True North
  • Estimated Annual Production: 13,992 kWh
  • Cost to Build: $30,774
View Full Site Specifications

Copyright © 2023 · Big Rivers Electric Corporation