Big Rivers Solar Education Center

  • About Us
    • Big Rivers
    • Jackson Purchase Energy Corporation
    • Kenergy Corp
    • Meade County Rural Electric Cooperative Corporation
  • Solar Arrays
    • Brandenburg
    • Hardinsburg
    • Owensboro
    • Henderson
    • Livingston County Middle School
    • Mike Miller Park
    • McCracken County High School
  • Learn More
    • How Solar Works
    • System Components
    • Our Solar Generation
    • What It Cost

JPEC – McCracken County High School

Instantaneous Power (kW)

8.07

Temperature
(F)

53.6°

Maximum Power (kW)

8.30

Irradiance (Solar Strength)

864 W/m²

March 31st, 2023
  • Hourly
  • Daily
  • Monthly
  • Yearly
View Site Specifications

Refresh the Page — (page auto-refreshes every 30 minutes)

previous arrow
next arrow
previous arrownext arrow
Shadow
Slider
  • System Size: 10.08 Kilowatt DC/8.25 Kilowatt AC
  • Total Number of Solar Modules: 32
  • System Phasing & Voltage: Single Phase 120/240 V
  • Maximum Possible Total System Current: 42.625 Amps
  • System Footprint: 12’ x 54’ or 648 sq. ft.
  • Number of Arrays: 1
  • Array(s) Azimuth: 180° True South
  • Estimated Annual Production: 14,011 kWh
  • Cost to Build: $33,372
View Full Site Specifications

Copyright © 2023 · Big Rivers Electric Corporation