Big Rivers Solar Education Center

  • About Us
    • Big Rivers
    • Jackson Purchase Energy Corporation
    • Kenergy Corp
    • Meade County Rural Electric Cooperative Corporation
  • Solar Arrays
    • Brandenburg
    • Hardinsburg
    • Owensboro
    • Henderson
    • Livingston County Middle School
    • Mike Miller Park
    • McCracken County High School
  • Learn More
    • How Solar Works
    • System Components
    • Our Solar Generation
    • What It Cost

Meade County RECC – Hardinsburg

Instantaneous Power (kW)

0.00

Temperature
(F)

42.3°

Maximum Power (kW)

8.13

Irradiance (Solar Strength)

0 W/m²

December 1st, 2023
  • Hourly
  • Daily
  • Monthly
  • Yearly
View Site Specifications

Refresh the Page — (page auto-refreshes every 30 minutes)

Henderson
Hardinsburg (Meade)-DSC_0020
Hardinsburg (Meade)-DSC_0022
IMG_0428
IMG_0425
IMG_0424
IMG_0423
IMG_0422
IMG_0421
IMG_0420
DSC_0021 (1)
DSC_0021
DSC_0020
previous arrow
next arrow
Henderson
Hardinsburg (Meade)-DSC_0020
Hardinsburg (Meade)-DSC_0022
IMG_0428
IMG_0425
IMG_0424
IMG_0423
IMG_0422
IMG_0421
IMG_0420
DSC_0021 (1)
DSC_0021
DSC_0020
previous arrow
next arrow
Shadow
  • System Size: 10.08 Kilowatt DC/8.25 Kilowatt AC
  • Total Number of Solar Modules: 32
  • System Phasing & Voltage: Single Phase 120/240 V
  • Maximum Possible Total System Current: 42.625 Amps
  • System Footprint: 12’ x 54’ or 1,215 sq. ft.
  • Number of Arrays: 1
  • Array(s) Azimuth: 150° True South
  • Estimated Annual Production: 13,579 kWh
  • Cost to Build: $30,606
View Full Site Specifications

Copyright © 2023 · Big Rivers Electric Corporation