Big Rivers Solar Education Center

  • About Us
    • Big Rivers
    • Jackson Purchase Energy Corporation
    • Kenergy Corp
    • Meade County Rural Electric Cooperative Corporation
  • Solar Arrays
    • Brandenburg
    • Hardinsburg
    • Owensboro
    • Henderson
    • Livingston County Middle School
    • Mike Miller Park
    • McCracken County High School
  • Learn More
    • How Solar Works
    • System Components
    • Our Solar Generation
    • What It Cost

Kenergy – Henderson

Instantaneous Power (kW)

0.00

Temperature
(F)

19.6°

Maximum Power (kW)

21.45

Irradiance (Solar Strength)

974 W/m²

February 1st, 2023
  • Hourly
  • Daily
  • Monthly
  • Yearly
View Site Specifications

Refresh the Page — (page auto-refreshes every 30 minutes)

previous arrow
next arrow
previous arrownext arrow
Shadow
Slider
  • System Size:30.24 Kilowatt DC/24.75 Kilowatt AC
  • Total Number of Solar Modules: 96
  • System Phasing & Voltage: Single Phase 120/240 V
  • Maximum Possible Total System Current: 127.875 Amps
  • System Footprint: 12’ x 160’ or 1,920 sq. ft.
  • Number of Arrays: 1
  • Array(s) Azimuth: 180° True South
  • Estimated Annual Production: 42,221 kWh
  • Cost to Build: $81,106.80
View Full Site Specifications

Copyright © 2023 · Big Rivers Electric Corporation